moving parts between assemblies
IsoTherm
Member Posts: 70 PRO
Greetings
I have several parts inserted into a main assembly that I wish to move into already inserted sub assemblies. Is there a way to do that without deleting the part(s) from the main assembly and then re-inserting them into the desired sub assembly? Would be handy.
Thanks,
Isotherm
I have several parts inserted into a main assembly that I wish to move into already inserted sub assemblies. Is there a way to do that without deleting the part(s) from the main assembly and then re-inserting them into the desired sub assembly? Would be handy.
Thanks,
Isotherm
Tagged:
0
Best Answer
-
@Benjamin_Dellal If the sub assy is in a different doc or version, you could also select the parts rmb, copy, go to the sub assy and paste. Then go to the other doc and delete the parts form the top assy, version and update. But as Lana says it is hard without seeing the full structure.5
Answers
-
Expand the sub assy in the tree and then just drag and drop the parts from the top assy into the sub assy.1
-
@brucebartlett
I get the error " Cannot be completed as it would modify a saved version" What am I doing wrong?0 -
@Benjamin_Dellal
It sounds like your assembly references the subassembly via version, possibly the subassembly exists in another document. If this is the case, there are different options, depending on the desired document structure - too hard to advise without seeing the document.
Please publish a link to your document here.1 -
@Benjamin_Dellal If the sub assy is in a different doc or version, you could also select the parts rmb, copy, go to the sub assy and paste. Then go to the other doc and delete the parts form the top assy, version and update. But as Lana says it is hard without seeing the full structure.5